
If you have more than one item, you can also send us your part number list (Spreadsheet) by uploading your list here.
Upload| Part Number : CK-104 LONG LEAD | Alternate P/N : CK104LONGLEAD | NSN : 5910001135499 |
|
|
Manufacturer : Crl Components Inc | CAGE Code : 71590 |
| FSC Details : 5910 Capacitors | NIIN : 001135499 | INC Code : 00007 |
| Country : USA | NCB Code : 00 |
Thank You for Submitting Your RFQ for Part Number CK-104 LONG LEAD by Crl Components Inc
We always put our customers’ needs first, and we are always just a click or call away from assisting you throughout the purchasing process whenever you need it. Please do not hesitate to call our toll-free number +1-714-705-4780 for any inquiries about part number CK-104 LONG LEAD, or send us an email listing your needs, and we will get back to you as soon as possible. Whatever your requirements may be, we will not rest until we have fulfilled all your operational needs with highly competitive options.
| NSN | FSC | NIIN | CLS | Hazmat | DEMIL | Cancelled NSN |
|---|---|---|---|---|---|---|
| 5910-00-113-5499 Item PartTypeName: CAPACITOR,FIXED,CERAMIC DIELECTR | 5910 | 001135499 | 0 | P | A | |
| CIIC | HCC | ESD | PMIC | Criticality | ENAC | |
| U | A | A | 0 | |||
| Part Number | ISC | RNVC | RNCC | HCC | MSDS | SADC |
| 3420-050E-104K | 3 | 1 | C | A |
| MRC | Criteria | Characteristic |
|---|---|---|
| AAQL | BODY STYLE | W/O MTG FACILITIES TERMINAL S) ON ONE SURFACE |
| AARG | RELIABILITY INDICATOR | ESTABLISHED |
| AARH | RELIABILITY FAILURE RATE LEVEL IN PERCENT | 0.0010 |
| ABJT | TERMINAL LENGTH | 1.250 INCHES MINIMUM |
| ADAQ | BODY LENGTH | 0.290 INCHES NOMINAL |
| ADAT | BODY WIDTH | 0.290 INCHES NOMINAL |
| ADAU | BODY HEIGHT | 0.090 INCHES NOMINAL |
| AEBP | CENTER TO CENTER DISTANCE BETWEEN TERMINALS PARALLEL TO LENGTH | 0.200 INCHES NOMINAL |
| AEBT | TERMINAL DIAMETER | 0.025 INCHES NOMINAL |
| AEBZ | SCHEMATIC DIAGRAM DESIGNATOR | NO COMMON OR GROUNDED ELECTRODE S) |
| AGAV | END ITEM IDENTIFICATION | MULTIPLE LAUNCH ROCKET SYSTEM MLRS) |
| CQBF | INSULATION RESISTANCE AT MAXIMUM OPERATING TEMP | 10000.0 MEGOHMS |
| CQBQ | CAPACITANCE VALUE PER SECTION | 0.100 MICROFARADS SINGLE SECTION |
| CQFB | VOLTAGE TEMP LIMITS PER SECTION IN PERCENT CAPACITANCE CHANGE | -25.0 TO 15.0 WITH RATED VOLTAGE APPLIED SINGLE SECTION |
| CQJJ | NONDERATED OPERATING TEMP | -55.0 DEG CELSIUS MINIMUM AND 125.0 DEG CELSIUS MAXIMUM |
| CQWM | NONDERATED CONTINUOUS VOLTAGE RATING AND TYPE PER SECTION | 100.0 DC SINGLE SECTION |
| CRTP | TOLERANCE RANGE PER SECTION | -10.00 TO 10.00 PERCENT SINGLE SECTION |
| CWJK | CASE MATERIAL | PLASTIC |
| CWPK | INSULATION RESISTANCE AT REFERENCE TEMP | 100000.0 MEGOHMS |
| CWPM | DISSIPATION FACTOR AT REFERENCE TEMP IN PERCENT | 2.5000 |
| CWSG | TERMINAL SURFACE TREATMENT | SOLDER |
| NHCF | NUCLEAR HARDNESS CRITICAL FEATURE | HARDENED |
| TEST | TEST DATA DOCUMENT | 81349-MIL-C-39014 SPECIFICATION INCLUDES ENGINEERING TYPE BULLETINS,BROCHURES,ETC.,THAT REFLECT SPECIFICATION TYPE DATA IN SPECIFICATION FORMAT EXCLUDES COMMERCIAL CATALOGS,INDUSTRY DIRECTORIES,AND SIMILAR TRADE PUBLICATIONS,REFLECTI |
| TTQY | TERMINAL TYPE AND QUANTITY | 2 UNINSULATED WIRE LEAD |
| ZZZK | SPECIFICATION/STANDARD DATA | 81349-MIL-C-39014/2 GOVERNMENT SPECIFICATION |
Before You Go, You Should Consider Looking at Our NSN Parts Catalog. and Remember, ASAP Sourcing Solutions Has Some of the Fastest and Most Competitive Quotes On the Market.
Request for Quote