
If you have more than one item, you can also send us your part number list (Spreadsheet) by uploading your list here.
Upload| Part Number : DD101 LONG LEAD | Alternate P/N : DD101LONGLEAD | NSN : 5910006788157 |
|
|
Manufacturer : Crl Components Inc | CAGE Code : 71590 |
| FSC Details : 5910 Capacitors | NIIN : 006788157 | INC Code : 00007 |
| Country : USA | NCB Code : 00 |
Thank You for Submitting Your RFQ for Part Number DD101 LONG LEAD by Crl Components Inc
We always put our customers’ needs first, and we are always just a click or call away from assisting you throughout the purchasing process whenever you need it. Please do not hesitate to call our toll-free number +1-714-705-4780 for any inquiries about part number DD101 LONG LEAD, or send us an email listing your needs, and we will get back to you as soon as possible. Whatever your requirements may be, we will not rest until we have fulfilled all your operational needs with highly competitive options.
| NSN | FSC | NIIN | CLS | Hazmat | DEMIL | Cancelled NSN |
|---|---|---|---|---|---|---|
| 5910-00-678-8157 Item PartTypeName: CAPACITOR,FIXED,CERAMIC DIELECTR | 5910 | 006788157 | 0 | P | ||
| CIIC | HCC | ESD | PMIC | Criticality | ENAC | |
| U | A | 0 | ||||
| Part Number | ISC | RNVC | RNCC | HCC | MSDS | SADC |
| 002-1024 | 3 | 9 | 5 |
| MRC | Criteria | Characteristic |
|---|---|---|
| AAQL | BODY STYLE | W/O MTG FACILITIES,RADIAL TERMINALS |
| AARG | RELIABILITY INDICATOR | NOT ESTABLISHED |
| ABJT | TERMINAL LENGTH | 1.500 INCHES MINIMUM |
| ABPM | BODY DIAMETER | 0.290 INCHES MAXIMUM |
| ADAQ | BODY LENGTH | 0.156 INCHES MAXIMUM |
| AEBS | CENTER TO CENTER DISTANCE BETWEEN TERMINALS PARALLEL TO DIAMETER | 0.250 INCHES NOMINAL |
| AEBT | TERMINAL DIAMETER | 0.025 INCHES NOMINAL |
| AEBZ | SCHEMATIC DIAGRAM DESIGNATOR | NO COMMON OR GROUNDED ELECTRODE S) |
| AGAV | END ITEM IDENTIFICATION | MISSILE,AI-TO-AIR,PHOEBNIX AIM-54) TELETYPE,MODEL 28 TEST CONSOLES,MINI-SACE ENGINE,AIRCRAFT TF33-PW-102 C-135E,EC-135H/K/P) MISSILE,AIR-TO-AIR,SPARROW AIM-7) SUPPORT EQUIPMENT,MX PEACEKEEPER MISSILE SUPPORT EQUIPMENT,B |
| CQBQ | CAPACITANCE VALUE PER SECTION | 100.000 PICOFARADS SINGLE SECTION |
| CQFB | VOLTAGE TEMP LIMITS PER SECTION IN PERCENT CAPACITANCE CHANGE | -56.0 TO 22.0 WITHOUT VOLTAGE APPLIED SINGLE SECTION |
| CQJJ | NONDERATED OPERATING TEMP | -55.0 DEG CELSIUS MINIMUM AND 85.0 DEG CELSIUS MAXIMUM |
| CQWM | NONDERATED CONTINUOUS VOLTAGE RATING AND TYPE PER SECTION | 1000.0 DC SINGLE SECTION |
| CRTL | CRITICALITY CODE JUSTIFICATION | FEAT |
| CRTP | TOLERANCE RANGE PER SECTION | -10.00 TO 10.00 PERCENT SINGLE SECTION |
| CWJK | CASE MATERIAL | PLASTIC |
| CWPK | INSULATION RESISTANCE AT REFERENCE TEMP | 10000.0 MEGOHMS |
| CWSG | TERMINAL SURFACE TREATMENT | SOLDER |
| FEAT | SPECIAL FEATURES | WEAPON SYSTEM ESSENTIAL |
| TTQY | TERMINAL TYPE AND QUANTITY | 2 UNINSULATED WIRE LEAD |
Before You Go, You Should Consider Looking at Our NSN Parts Catalog. and Remember, ASAP Sourcing Solutions Has Some of the Fastest and Most Competitive Quotes On the Market.
Request for Quote